On the Key Points of Technical Management in High rise Building Engineering

Jie Jin
Vol. 4, No. 1, pp. 235-238, 2024 DOI: 10.54691/gy2car84 January 23, 2024
Download PDF
Abstract.For the technical management of high-rise building construction projects, it involves a systematic approach throughout the entire construction process. The pre construction stage requires careful planning, from site selection to market analysis, while engineering design ensures structural integrity and functional efficiency. Efficient project organization, procurement, and on-site management, as well as strict quality control, are crucial during the construction phase. The focus of the post construction phase is debugging, seamless handover, and continuous facility operation and maintenance. Overall, by adopting comprehensive technical management, the safe and efficient construction of high-rise buildings has been ensured, meeting functional and aesthetic requirements while considering environmental protection.
Keywords. High-rise buildings; Construction engineering; Technical management; main points.
APA Citation Jie Jin (2024). On the Key Points of Technical Management in High rise Building Engineering. Frontiers in Humanities and Social Sciences, 4(1), 235-238. https://doi.org/10.54691/gy2car84

References

  1. Zhang Quanjing. Key points of technical management for super high-rise building engineering [J]. Shanxi Architecture, 2019 (12): 67.
  2. Ma Lei. Analysis of Key Points in Technical Management of Super High rise Building Engineering [J]. Encyclopedia Forum Electronic Journal, 2019 (11): 181.
  3. Cheng Xingliang. Key points and value of construction technology for high-rise buildings [J]. Building Materials and Decoration, 2020 (06): 1-2.
  4. Su Yangfan. Discussion on Technical Standards and Management of High rise Building Construction [J]. China Standardization, 2019 (20): 48-49.